Interactive Facility Design & Investment Calculator
| Parameter | Value |
|---|---|
| Total Area (m²) | 3,500 m² |
| Ceiling Height (m) | 6.0m (Ground), 4.5m+ (Upper) |
| Power Capacity (kW) | 1,650 kW |
| Expansion Reserve | 700 m² (20% Buffer) |
| Equipment Type | Quantity | Unit Price (10k USD) | Subtotal (10k USD) |
|---|---|---|---|
| CNC Machines | 12 | 45 | 540 |
| Assembly Lines | 6 | 25 | 150 |
| QC Equipment | 1 Set | 80 | 80 |
| Total Equipment Investment | 770 (10k USD) | ||
| Investment Item | Amount (10k USD) | Percentage |
|---|---|---|
| Land Cost | 2,800 | 54.9% |
| Construction Cost | 1,050 | 20.6% |
| Equipment Cost | 770 | 15.1% |
| Operating Capital | 480 | 9.4% |
| Total Investment | 5,100 (10k USD) | 100% |
Current Progress: 25% (Design Phase)
| Requirement Type | Standard |
|---|---|
| Lighting | 300-500 lux (Precision Area), 200 lux (Assembly Area) |
| Cleanliness | ISO Class 7 (Assembly), ISO Class 5 (PCB) |
| Safety | Motor Mount Vibration Damping (SC3 Rubber) |
| Temperature Control | 20-24°C ±2°C |
Frontend: React.js + D3.js (Interactive Charts)
Backend: Node.js + MongoDB (Cost/Time Data)
Integration: Autodesk Navisworks API (4D Visualization)
Deployment: AWS/Alibaba Cloud + Docker